Herriman secondary water
Secondary water in Herriman is available only in some areas, it's metered, and it's normally on from early May to mid-October. The 2026 shutdown happens in stages, so pressure may drop gradually before it stops. Once your pressure is gone, it's time to blow out.
When to winterize in Herriman
Local guides put Herriman in the upper-bench group, with a recommended blowout by October 15. That date has passed, so book the ASAP window and keep the system off until it's done.
Newer-build tips
Most Herriman systems are fairly new, often with smart controllers and many zones. Newer doesn't mean freeze-proof. The backflow preventer above ground is still the most freeze-sensitive part.
What a blowout costs in Herriman
You pay $15 for each zone on your controller, with a $75 minimum: up to 5 zones is $75, 6 is $90 and 8 is $120. There are no trip fees and no "starting at" quotes. Send a request online, a local tech blows out your system on your neighborhood's route day, and you pay when the job is done.
ZIP codes we serve
84096
Herriman sprinkler blowout FAQ
When does Herriman secondary water turn off?
Normally mid-October. In 2026 the staged shutdown began Oct 13, with Blackridge first.
When does Herriman secondary water come back on?
Usually early May. Join our spring waitlist and we'll remind you about startups.
Do you serve my ZIP in Herriman?
We serve 84096. Enter your ZIP on the booking page for an instant check.
Nearby: Sprinkler blowout Riverton · Sprinkler blowout South Jordan · Sprinkler blowout Draper
Sources
- Herriman City — Secondary water
- Herriman City — Secondary water shutting down (Oct 13, 2026)
- Pure Irrigation — When to winterize sprinklers in Utah
Dates and prices change. Always confirm with your water provider. Last reviewed 2026-10-17.